Explore 273 acres of terrain on Tucker Mountain with the new Three Bears chairlift, completed in December 2019. This three-person fixed grip lift accesses terrain that was previously accessible via snowcat or hiking only. The lift comes complete with a ski patrol warming hut at the summit.
Tucker Mountain has long been considered some of the best expert terrain in-bounds at any Colorado ski resort. The north-facing slopes allow snow to remain pristine meaning powder turns long after the last storm. Coming in at 12,337 feet in elevation, the turns are as sweet as the views.

December 27, 2019
Three Bears opens for the season!
October 16, 2019
The chairs are here, and the cable is getting spliced!

September 15, 2019
The towers are in! The bottom terminal is scheduled to be installed at the end of this month.
August 15, 2019
Concrete for the new Tucker Mountain lift towers has been coming in over the past couple of days with plans for the actual towers and steel components to be installed in September.

July 17, 2019
Time for the top terminal! A helicopter came in once again to fly the top terminal of the lift as well as the bullwheel. Equipment will continue to be hauled onto the mountain via helicopter.
June 21, 2019
Helicopter operations have begun to pour concrete for the Patrol Outpost as well as the top lift terminal. Additional helicopter work will continue into next week as more concrete is set.
![]()

June 14, 2019
Digging for the Tucker Ski Patrol Outpost has begun. Snow fences are currently being installed on the ridge at the top of the mountain for better access from the lift.